| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Halon 1301 Systems |
|
|
|
|
|
|
NFPA 12A
top of page |
| System Inspection |
|
|
4 |
|
|
4-1.1 |
At least
semiannually, all systems shall be thoroughly inspected, tested, and documented for proper
operation by trained competent personnel. Tests shall be in accordance with the
appropriate NFPA or Canadian standards. |
| Container Test |
|
|
|
|
4 |
4-2.1 |
DOT, CTC, or similar
design Halon 1301 cylinders shall not be recharged without a retest if more than five
years have elapsed since the date of the last test and inspection. |
| Hose Inspection |
|
|
|
4 |
|
4-3 |
All system hoses
shall be examined annually for damage. |
| Hose Test |
|
|
|
|
4 |
4-3.2 |
All hoses shall be
tested every 5 years in accordance with 4-3.1. |
| Room Integrity |
|
|
4 |
|
|
4-4 |
At least every 6
months the halon-protected enclosure shall be thoroughly inspected to determine if
penetrations or other changes have occurred that could adversely affect halon leakage. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Dry Chemical Systems |
|
|
|
|
|
|
NFPA 17
top of page |
| Maintenance |
|
|
4 |
|
|
9-3.1 |
At least
semiannually, maintenance shall be conducted in accordance with the manufacturers
listed installation and maintenance manual. |
| Container Test |
|
|
|
|
4 |
9-5a. |
The following parts
of dry chemical extinguishing systems shall be subjected to a hydrostatic pressure test at
intervals not exceeding 12 years: a. Dry Chemical Containers |
| Hose Test |
|
|
|
|
4 |
9-5c. |
The following parts
of dry chemical extinguishing systems shall be subjected to a hydrostatic pressure test at
intervals not exceeding 12 years: c. Hose Assemblies |
| Agent Examination |
|
|
4 |
|
|
9-3.1d. |
Examination of the
dry chemical (If there is evidence of caking, the dry chemical shall be discarded and the
system shall be recharged in accordance with the manufacturers instructions.) |
| Agent Replacement |
|
|
|
|
4 |
9-5.2 |
Dry chemical agent
removed from the containers prior to hydrostatic testing shall be discarded. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Wet Chemical Systems |
|
|
|
|
|
|
NFPA 17A
top of page |
| Maintenance |
|
|
4 |
|
|
5-3.1.1 |
At least
semiannually, maintenance shall be conducted in accordance with the manufacturers
listed installation and maintenance manual. |
| Container Test |
|
|
|
|
4 |
5-5a. |
The following parts
of wet chemical extinguishing systems shall be subjected to a hydrostatic pressure test at
intervals not exceeding 12 years: a. Wet Chemical Containers |
| Hose Test |
|
|
|
|
4 |
5-5c. |
The following parts
of wet chemical extinguishing systems shall be subjected to a hydrostatic pressure test at
intervals not exceeding 12 years: c. Hose Assemblies |
| Agent Replacement |
|
|
|
|
4 |
5-5.2 |
Wet chemical agent
removed from the containers prior to hydrostatic testing shall be discarded. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Fire Alarm & Detection Systems |
|
|
|
|
|
|
NFPA 72
top of page |
| Visual Inspection |
|
|
|
|
|
7-3.1 |
Visual
inspection shall be performed in accordance with the schedules in Section 7-3 or more
often if required by the authority having jurisdiction. The visual inspection shall be
made to ensure that there are no changes that affect equipment performance. |
| Control Panels |
|
|
|
4 |
|
|
| Batteries |
|
|
4 |
|
|
|
| Remote Annunciators |
|
|
4 |
|
|
|
| Initiating Devices |
|
|
|
|
|
|
| Air Sampling |
|
|
4 |
|
|
|
|
| Duct Detectors |
|
|
4 |
|
|
|
|
| Electromechanical
Releasing Devices |
|
|
4 |
|
|
|
|
| Suppression System
Switches |
|
|
4 |
|
|
|
|
| Manual Pull Stations |
|
|
4 |
|
|
|
|
| Heat Detectors |
|
|
4 |
|
|
|
|
| Radiant Energy Fire
Detectors |
|
4 |
|
|
|
|
|
| Smoke Detectors |
|
|
4 |
|
|
|
|
| Supervisory Signal
Devices |
|
4 |
|
|
|
|
|
| Waterflow Devices |
|
4 |
|
|
|
|
|
| Alarm Notification
Appliances |
|
|
4 |
|
|
|
|
| Interface Equipment |
|
|
4 |
|
|
|
|
| Digital Alarm
Communication Equipment |
|
|
4 |
|
|
|
|
| Testing |
|
|
|
|
|
7-3.2 |
Testing
shall be performed in accordance with the schedules in Chapter 7 or more often if required
by the authority having jurisdiction. If automatic testing is performed at least weekly by
a remotely monitored fire alarm control unit specifically listed |
| Control Panels |
|
|
|
4 |
|
|
| Batteries |
|
|
4 |
|
|
|
| Remote Annunciators |
|
|
|
4 |
|
|
| Initiating Devices |
|
|
|
|
|
|
| Air Sampling |
|
|
|
4 |
|
|
| Duct Detectors |
|
|
|
4 |
|
|
| Electromechanical
Releasing Devices |
|
|
|
4 |
|
|
| Suppression System
Switches |
|
|
|
4 |
|
|
|
| Manual Pull Stations |
|
|
|
4 |
|
|
|
| Heat Detectors |
|
|
|
4 |
|
|
|
| Radiant Energy Fire
Detectors |
|
|
4 |
|
|
|
|
| Smoke Detectors |
|
|
|
4 |
|
|
|
| Supervisory Signal
Devices |
|
4 |
|
|
|
|
|
| Tamper Switches |
|
|
4 |
|
|
|
|
| Waterflow Devices |
|
|
4 |
|
|
|
|
| Alarm Notification
Appliances |
|
|
|
4 |
|
|
|
| Interface Equipment |
|
|
|
4 |
|
|
|
| Digital Alarm
Communication Equipment |
|
|
|
4 |
|
|
|
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Fire Extinguishers |
|
|
|
|
|
|
NFPA 10
top of page |
| Inspection |
4 |
|
|
|
|
4-3.1 |
Fire extinguishers
shall be inspected when initially placed in service and thereafter at approximately 30-day
intervals. |
| Maintenance |
|
|
|
4 |
|
4-4.1 |
Fire extinguishers
shall be subjected to maintenance at intervals of not more than 1 year, at the time of
hydrostatic test, or when specifically indicated by an inspection. |
| 6-Year Maintenance |
|
|
|
|
4 |
4-4.3 |
Every 6 years,
stored-pressure fire extinguishers that require a 12-year hydrostatic test shall be
emptied and subjected to the applicable maintenance procedures. |
| Hydrostatic Test |
|
|
|
|
4 |
5-2 |
Refer to Table 5-2. |
| Pressurized Water |
|
|
|
|
4 |
|
5 Years |
| Wetting Agent(s) |
|
|
|
|
4 |
|
5 Years |
| AFFF Foam |
|
|
|
|
4 |
|
5 Years |
| FFFP Foam |
|
|
|
|
4 |
|
5 Years |
| Carbon Dioxide (CO2) |
|
|
|
|
4 |
|
5 Years |
| Dry Chemical(s) |
|
|
|
|
4 |
|
12 Years |
| Halogenated Agent(s) |
|
|
|
|
4 |
|
12 Years |
| Hose Conductivity
Testing |
|
|
|
4 |
|
4-4.1.2 |
A conductivity test
shall be conducted annually on all carbon dioxide hose assemblies. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Fire Hose |
|
|
|
|
|
|
NFPA 1962
top of page |
| Inspection |
|
|
|
|
|
|
|
| Hose |
|
|
|
4 |
|
2-4.1 |
The hose shall be
service-tested as specified in Section 5-4 within 90 days prior to being placed in service
for the first time and at least annually. |
| Couplings |
|
|
|
4 |
|
4-2.1 |
Couplings shall be
kept in serviceable condition. After each use, and during each hose service test, they
shall be visually inspected
|
| Gaskets & Seals |
|
|
|
4 |
|
4-3.1 |
The thread gasket in
couplings and nozzles shall be inspected for presence, tight fit, and lack of
deterioration. If defective, it shall be replaced with a new gasket. |
| Nozzles |
|
|
|
4 |
|
4-1.2 |
All nozzles shall be
inspected after each use and at least annually. |
| Re-rack Hose |
|
|
|
4 |
|
2-3.3 |
In-service hose
shall be unracked, unreeled, or unrolled and physically inspected as specified in Section
2-5 at least annually. Hose shall be reracked, rereeled, or rerolled so that any folds do
not occur at the same position on the hose. |
| Hydrostatic Test |
|
|
|
|
4 |
2-3.2 |
In-service hose
designed for occupant use only shall be removed and service-tested as specified in Chapter
5 at intervals not exceeding 5 years after installation and every 3 years thereafter. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Fire Department Connections |
|
|
|
|
|
|
NFPA 25
top of page |
| Inspection |
|
4 |
|
|
|
9-7.1 |
Fire department
connections shall be inspected quarterly. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Pressure Reducing and Relief Valves |
|
|
|
|
|
|
NFPA 25
top of page |
| Inspection |
|
4 |
|
|
|
9-5.1 |
Sprinkler pressure
reducing control valves shall be inspected and tested as described in 9-5.1.1 and 9-5.1.2. |
| Sprinkler Systems |
|
4 |
|
|
|
9-5.1.1 |
All valves shall be
inspected quarterly. |
| Hose Connections |
|
4 |
|
|
|
9-5.2.1 |
All valves shall be
inspected quarterly. |
| Hose Racks |
|
4 |
|
|
|
9-5.3.1 |
All valves shall be
inspected quarterly. |
| Fire Pump Casing
Relief Valves |
|
|
|
|
4 |
9-5.5.1 |
All circulation
relief valves shall be inspected weekly. |
| Fire Pump Pressure
Relief Valves |
|
|
|
|
4 |
9-5.5.2 |
All pressure relief
valves shall be inspected weekly. |
| System Type |
Monthly |
Quart. |
Semi
Ann. |
Ann. |
Other |
Code |
Requirement |
| Sprinkler Systems |
|
|
|
|
|
|
NFPA 25
top of page |
| Inspection |
|
|
|
|
|
|
|
| Gauges - Dry,
PreAction & Deluge |
|
|
|
|
4 |
2-2.4.2 |
Gauges on dry,
preaction, and deluge systems shall be inspected weekly to ensure that normal air and
water pressures are being maintained. |
| Gauges - Wet Pipe
Systems |
4 |
|
|
|
|
2-2.4.1 |
Gauges on wet pipe
sprinkler systems shall be inspected monthly to ensure that they are in good condition and
that normal water supply pressure is being maintained. |
| Control Valves |
4 |
|
|
|
4 |
|
(See
"Valves" below) |
| Alarm Devices |
|
4 |
|
|
|
2-2.6 |
Alarm devices shall
be inspected quarterly to verify that they are free of physical damage. |
| Hydraulic Nameplate |
|
4 |
|
|
|
2-2.7 |
The hydraulic
nameplate, if provided, shall be inspected quarterly to verify that it is attached
securely to the sprinkler riser and is legible. |
| Buildings |
|
|
|
4 |
|
2-2.5 |
Annually, prior to
the onset of freezing weather, buildings with wet pipe systems shall be inspected to
verify that windows, skylights, doors, ventilators, other openings and closures, blind
spaces, unused attics, stair towers, roof houses, and low spaces |
| Hangers/Bracing |
|
|
|
4 |
|
2-2.3 |
Sprinkler pipe
hangers and seismic braces shall be inspected annually from the floor level. |
| Pipe & Fittings |
|
|
|
4 |
|
2-2.2 |
Sprinkler pipe and
fittings shall be inspected annually from the floor level. |
| Sprinkler Heads |
|
|
|
4 |
|
2-2.1.1 |
Sprinklers shall be
inspected from the floor level annually. |
| Spare Sprinkler Heads |
|
|
|
4 |
|
2-2.1.3 |
The supply of spare
sprinklers shall be inspected annually
|
| Valves (All Types) |
|
|
|
|
|
|
(See
"Valves" below) |
| Testing |
|
|
|
|
|
|
|
| Alarm Devices |
|
4 |
|
|
|
2-3.2 |
Waterflow alarm
devices including, but not limited to, mechanical water motor gongs, vane-type waterflow
devices, and pressure switches that provide audible or visual signals shall be tested
quarterly. |
| Main Drain |
|
4 |
|
|
|
|
(See
"Valves" below) |
| Antifreeze Solution |
|
|
|
4 |
|
2-3.4 |
The freezing point
of solutions in antifreeze shall be tested annually by measuring the specific gravity with
a hydrometer or refractometer and adjusting the solutions if necessary. |
| Gauges |
|
|
|
|
4 |
2-3.2 |
Gauges shall be
replaced every 5 years or tested every 5 years by comparison with a calibrated gauge.
Gauges not accurate to within 3 percent of the full scale shall be recalibrated or
replaced. |
| Sprinkler Heads |
|
|
|
|
4 |
2-3.1.1 |
Where sprinklers
have been in service for 50 years, they shall be replaced or representative samples from
one or more sample areas shall be submitted to a recognized testing laboratory acceptable
to the authority having jurisdiction for field service test |
| Sprinkler Heads -
Extra High Temp |
|
|
|
|
4 |
2-3.1.1 |
Exception No. 3*:
Representative samples of solder-type sprinklers with a temperature classification of
extra high [325°F (163°C)] or greater that are exposed to semicontinuous to continuous
maximum allowable ambient temperature conditions shall be teste |
| Sprinkler Heads -
Fast Response |
|
|
|
|
4 |
2-3.1.1 |
Exception No. 2:
Sprinklers manufactured using fast response elements that have been in service for 20
years shall be tested. They shall be retested at 10-year intervals. |
| Maintenance |
|
|
|
|
|
|
|
| Valves (All Types) |
|
|
|
4 |
4 |
|
(See
"Valves" below) |
| Obstruction
Investigation |
|
|
|
|
4 |
10-2.2 |
Systems shall be
examined internally for obstructions where conditions exist that could cause obstructed
piping. If the condition has not been corrected or the condition is one that could result
in obstruction of piping despite any previous flushing proce |
| Valves |
|
|
|
|
|
|
|
| Inspection |
|
|
|
|
|
|
|
| Control Valves |
|
|
|
|
4 |
9-3.3.1 |
All valves shall be
inspected weekly. |
| Alarm Valves |
4 |
|
|
|
|
9-4.1.1 |
Alarm valves shall
be externally inspected monthly. |
| Check Valves |
|
|
|
|
4 |
9-4.2.1 |
Valves shall be
inspected internally every 5 years to verify that all components operate properly, move
freely, and are in good condition. |
| Preaction/Deluge
Valves |
|
|
|
4 |
|
9-4.3.1.3 |
The interior of the
preaction or deluge valve and the condition of detection devices shall be inspected
annually when the trip test is conducted. |
| Dry Pipe Valves/Quick
Opening Devices |
|
|
|
4 |
|
9-4.4.1.4 |
The interior of the
dry pipe valve shall be inspected annually when the trip test is conducted. |
| Backflow Prevention
Assemblies |
|
|
|
4 |
|
9-6.1.2 |
All backflow
preventers installed in fire protection system piping shall be tested annually
|
| Testing |
|
|
|
|
|
|
|
| Main Drain |
|
4 |
|
|
|
9-2.6 |
A main |